The timeframe can be expressed either as a completion date, or a start date and completion date.
举一反三
- If the project completion time is normally distributed and the due date for the project is greater than the expected completion time, then the probability that the project will be finished by the due date is A: a. less than 0.50. B: b. greater than 0.50. C: c. equal to 0.50. D: d. undeterminable without more information.
- A project schedule completion date will change if (). A: the critical path is reduced B: the contingency is no longer available C: no float time is available D: project resources are reduced
- The date of shipment and the validity of L/C should be extended to the same date.
- The custom _______ the Middle Ages. A: date on B: date about C: date from D: date in
- 查询十天前的记录应使用( )作为准则。 A: Between Date() And Date()-10 B: <Date()-10 C: >Date()-10 D: Between Date()-10 And Date()