智慧职教: 6.S1:Check lifeboat equipment and report. S2:Lifeboat equipment complete and operational. Q:How about lifeboat equipment?
Complete and operational.
举一反三
- 智慧职教: 6.S1:Start engine and report. S2:Engine started. Q:How about engine?
- Line throwing equipment should not be operated(). A: during a rain storm B: in an explosive atmosphere C: near a lifeboat station D: by other than licensed officer
- 11. When should operational check on navigation equipment be done? ____
- Describe the life saving appliances on board a ship. A: A. Lifeboat, liferaft, lifejacket. B: B. Open lifeboat, semi-closed lifeboat, totally enclosed lifeboat. C: C. The third officer's responsibility. D: A,B,C
- Prior to lowering the lifeboat,the most important item to check is the().
内容
- 0
How should the lifeboat sea painter be rigged?()
- 1
智慧职教: S1:Who takes charge of the fire-fighting equipment in the engine room? S2:In general, the second engineer takes charge of it. Q: Who takes charge of the fire-fighting equipment in the engine room?
- 2
___________ n. a piece of equipment, esp. electrical equipment, used in people's homes
- 3
Your company purchased on credit art equipment from Greg’s Equipment Company for $3,900. The transaction will be recorded as:
- 4
The engine in a covered lifeboat is fueled with().