    Is there anything () for tonight?
    A: Planned
    B: Planning
    C: Plan
  • A

    内容

    • 0

      You have to_________ for future. A: make a plan B: planning C: take a plan D: plans

    • 1

      ( ) is with the advantages of easy to prepare, simple, clear and intuitive. A: single code network planning B: double code network planning C: time scale network planning D: bar chart plan

    • 2

      A plan was put forward by William Low. He _______it. A: suggested B: intended C: aimed at D: planned

    • 3

      The outcome of process planning is a production plan, a materials order, and machine programming.

    • 4

      In roiling wave planning: A: Focus is maintained on long-term objectives, allowing near-term objectives to he roiled out as part of the ongoing wave of activitie B: The work to be accomplished in the near term is planned in detail at a low level of the WB C: The work far in the future is planned in detail for WBS components that are at a low level of the WB D: A wave of detailed activities is planned during strategic planning to ensure that project milestones are achieve