中国大学MOOC:"A fixed cost is constant within the relevant range. In other words, fixed costs do not change for changes in activity that fall within the “relevant range.”";
举一反三
- The fixed costs in the flexible budget are the same as the planning budget because they do not change in response to changes in the activity level within the relevant range. A: 正确 B: 错误
- As the cost-driver activitylevel increases within the relevant range:
- An organisation manufactures a single product. The total cost of making 4,000 units is $20,000 and the total cost of making 20,000 units is $40,000. Within this range of activity the total fixed costs remain unchanged.What is the variable cost per unit of the product?
- A cost is described as staying the same over a certain activity range and then increasing but remaining stable over a revised activity range in the short term. What type of cost is this?? A semi-variable cost|A stepped fixed cost|A variable cost|A fixed cost
- The relevant range is: A: the range of activity in which variable costswill be curvilinear. B: the range of activity in which fixed costswill be curvilinear. C: he range over which the company expectsto operate during a year. D: usually from zero to 100% of operatingcapacity.