The carrier is entitled to limit his liability to the stated sum per package or unit even if he failed to exercise due diligence to make the vessel().
举一反三
- The carrier has,before and at the beginning of the voyage,to()due diligence to make the ship seaworthy.
- In the high-low method, the change in total cost is due to: A: a. fixed cost per unit B: b. mixed cost per unit C: c. total fixed cost D: d. variable cost per unit
- 智慧职教: His diligence was ________ he made great progress.
- By issuing a clean bill of lading, the carrier admits full liability for the goods and condition in which he received them.
- He had failed in the exam. It made his father very angry. He had failed in the exam, .