As per UCP600, the words “to”, “till”, “from”, “between” when used to determine a period of shipment include the date or dates mentioned, the words “before” and “after” exclude the date mentioned. ()
举一反三
- Thewords“to”, “until”, “till”, “from”will be understood toincludethe date________while “after” will be understood to________the date mentioned.
- In time of shipment, “on or about” means shipment is to be made during the period from 5 days________to 5 days________the specified date,both________daysincluded.
- AsperUCP600,thewords“to”,“till”,“from”,“between”whenusedtodetermineaperiodofshipmentincludethedateordatesmentioned,thewords“before”and“after”excludethedatementioned.()
- L/C indicates three dates, which must be met to be paid: the latest date for shipment, the expiry date for presentation of documents and the expiry date of the L/C.
- If the latest date of shipment is April 15,2009,the goods should be shipped____. A: after April 15 B: on or before April 15 C: between April 10 to April 20 D: on April 20