Which of the following is an absolute requirement in job costing?
A: A client asks the company to quote for a job
B: Use of a composite cost unit
C: Job specific cost control procedures are put in place
D: All direct costs of the job are coded to the job code
A: A client asks the company to quote for a job
B: Use of a composite cost unit
C: Job specific cost control procedures are put in place
D: All direct costs of the job are coded to the job code
举一反三
- Normal spoilage adds to the cost of the job to which it is attributed in a job order costing system.
- Normal spoilage adds to the cost of the job to which it is attributed in a job order costing system. A: 正确 B: 错误
- When a job is complete: A: Work-in-Process Control is debited B: Finished Goods Control is credited C: the cost of the job is transferred to Manufacturing Overhead Control D: actual direct materials, actual direct manufacturing labor, and allocated manufacturing overhead will comprise the total cost of the job
- Which TWO of the following are direct costs? A: The depreciation of stores equipment B: The hire of a machine for a specific job C: Royalty paid for each unit of a product produced D: Factory rent
- Which of the following is NOT an improved job design? A: Micro-design B: Job enrichment C: Job enlargement D: Job rotation