• 2022-06-06
    If no metric is specified for the routes being redistributed into IS-IS, what metric value is assigned to the  routes?()
    A:  0
    B:  1
    C:  10
    D:  20
  • A

    内容

    • 0

      Which of the following quote could be a valid export quote? ( ) A: USD58/PER METRIC TON CIF LONDON B: USD58/PER METRIC TON FOB LONDON C: USD58/PER METRIC TON FCA SHANGHAI D: USD58/PER METRIC TON DAT LONDON

    • 1

      下列我国某公司进口报价,正确的是( ) A: USD58.00/PER METRIC TON CFR LONDON B: USD58.00/PER METRIC TON CIF SHANGHAI C: USD58.00/PER METRIC TON FOB SHANGHAI D: USD58.00/PER METRIC TON FCA SHANGHAI

    • 2

      下列我国某公司进口报价,正确的是( ) A: USD58.00/PER METRIC TON CFR LONDON B: USD58.00/PER METRIC TON CIF SHANGHAI C: USD58.00/PER METRIC TON FOB SHANGHAI D: USD58.00/PER METRIC TON FCA SHANGHAI

    • 3

      The buyer and the seller have agreed in the contract that the seller shall export 3000 metric tons of soybeans, with a quantity more or less of 10% at the seller's option. But, the actual quantity delivered by the seller is 3500 metric tons. Which are the rights of the buyer? A: take delivery all of them. B: refuse to take delivery of all of them. C: refuse to take delivery of 500 metric tons. D: refuse to take delivery of 200 metric tons. E: refuse to take delivery of 100 metric tons.

    • 4

      The values are assigned as j = k = 3. What will be the value of c = j *= k + 5 ? ________ A: 24 B: 20 C: 11 D: 8