• 2022-06-06
    In the process of well testing, every measured pressure and production does not change with time is()
    A: steady-state well testing
    B: unsteady test
    C: Pressure well test
    D: Constant pressure production well test
  • A

    内容

    • 0

      Do we need to test every function in Unit Testing?

    • 1

      "I passed my test with flying colors" means:( ) A: I did very well on my test B: I passed my test by cheating C: I barely passed my test

    • 2

      The Object of Production Engineering is: A: vicinity of wellbore B: Well Groups C: Well Prodction System D: Wellbore

    • 3

      In a constant pressure process for a closed system, the enthalpy change of the system depends on the heat exchanged.

    • 4

      Mary did very well in this test ____she had not prepared well. A: considering (that) B: although C: ecause D: when