• 2022-06-17
    Throughput costing considers only direct materials and direct manufacturing labor to be truly variable costs.
  • 错误

    内容

    • 0

      When a job is complete: A: Work-in-Process Control is debited B: Finished Goods Control is credited C: the cost of the job is transferred to Manufacturing Overhead Control D: actual direct materials, actual direct manufacturing labor, and allocated manufacturing overhead will comprise the total cost of the job

    • 1

      The four types of costs that are found in the Life Cycle Costing concept are ______. A: operating/maintenance, discard, direct, and variable B: indirect, auxiliary, development, and production C: operating/maintenance, development, discard, and production D: indirect, auxiliary, indirect, and direct

    • 2

      The overtime premium of direct labor for a specific order is presented as indirect costs.

    • 3

      中国大学MOOC:"Which of the following costs belongs to direct labor costs?";

    • 4

      中国大学MOOC: Operating budget for a manufacturer consists of sales budget, ending inventory budget, production budget, direct materials budget, direct labor budget, manufacturing overhead budget as well as selling and administrative expense budget