A: Operate
B: Design
C: Plan
D: Prepare
举一反三
- Which of the following is the correct order of phases in the systems development life cycle? A: analysis, planning, design, implementation B: analysis, design, planning, implementation C: planning, analysis, design, implementation D: design, analysis, planning, implementation
- Which of the following is an element of a communications plan?
- Which of the following is Maya Lin's design?
- Which of the following is not a design feature of human language?
- Which of the following is the most traditional design of collar for Chinese cheongsam?
内容
- 0
Which of the following is not a phase in the design of a global supply chain network?
- 1
These include design for reliability, design for serviceability, design for modularity and design for quality, which must be applied in the entire system.() A: for B: to C: with D: as
- 2
Which of the following are mine construction procedures ?( ) A: Mine pre-feasibility study B: Mine feasibility study C: Preliminary mine design D: Mine construction design
- 3
Which of the following is an element of a communications plan?( ) A: Chairperson B: Strategy C: Television interviews D: Press releases
- 4
Which of the following is false?( ) A: The design and construction services are contracted by a single entity known as the design–builder or design–build contractor B: The client commissions the consultants to produce conceptual or schematic design before leaves the project to the contractor. C: The contractor needs to completes the design and produces the documentation required to construct the facility. D: The contractor often completes the design before the construction.