In CIF the risk passes at _______ while the costs are transferred at _________. A: port of shipment, place of destination B: port of shipment, port of destination C: port of destination, place of shipment D: port of destination, port of shipment
In CIF the risk passes at _______ while the costs are transferred at _________. A: port of shipment, place of destination B: port of shipment, port of destination C: port of destination, place of shipment D: port of destination, port of shipment
Hie price term FOB should be followed by the name of_______. A: port of destination B: port of shipment C: port of destination D: port of consignee
Hie price term FOB should be followed by the name of_______. A: port of destination B: port of shipment C: port of destination D: port of consignee
Port of destination is the port where goods are shipped and depart.
Port of destination is the port where goods are shipped and depart.
The term CFR should be added with ________. A: the Port of shipment B: the Place of delivery C: the Place of destination D: the Port of destination
The term CFR should be added with ________. A: the Port of shipment B: the Place of delivery C: the Place of destination D: the Port of destination
If there is no steamer directly from the port of loading to the port of destination, ( ) is necessary.
If there is no steamer directly from the port of loading to the port of destination, ( ) is necessary.
以下是在华为路由上的ACL语句中,含义为“允许192.168.1.0/24 网段所有PC访问10.1.0.10中的telnet服务”的是( )。 A: ule deny tcp source 192.168.1.0 0.0.0.255 destination 10.1.0.10 0 destination-port eq telnet B: ule permit tcp source 192.168.1.0 0.0.0.255 destination 10.1.0.10 0 destination-port eq telnet C: ule permit udp destination-port eq telnet source 192.168.1.0 0.0.0.255 destination 10.1.0.10 0 D: ule permit tcp destination-port eq telnet source 192.168.1.0 0.0.0.255 destination 10.1.0.10 0
以下是在华为路由上的ACL语句中,含义为“允许192.168.1.0/24 网段所有PC访问10.1.0.10中的telnet服务”的是( )。 A: ule deny tcp source 192.168.1.0 0.0.0.255 destination 10.1.0.10 0 destination-port eq telnet B: ule permit tcp source 192.168.1.0 0.0.0.255 destination 10.1.0.10 0 destination-port eq telnet C: ule permit udp destination-port eq telnet source 192.168.1.0 0.0.0.255 destination 10.1.0.10 0 D: ule permit tcp destination-port eq telnet source 192.168.1.0 0.0.0.255 destination 10.1.0.10 0
CIF should be followed by( ). A: port of transshipment B: port of destination C: port of call D: port of shipment
CIF should be followed by( ). A: port of transshipment B: port of destination C: port of call D: port of shipment
The port in which crew or passengers go on board the ship is called(). A: port of call B: port of embarkation C: port of destination D: port of disembarkatio
The port in which crew or passengers go on board the ship is called(). A: port of call B: port of embarkation C: port of destination D: port of disembarkatio
Normally, there is one specific port of shipment and one specific port of destination stipulated in the contract.
Normally, there is one specific port of shipment and one specific port of destination stipulated in the contract.
The port of destination is usually proposed and determined by the seller.
The port of destination is usually proposed and determined by the seller.