本工程建施03一层平面图采用比例为( )。 A: 1:10 B: 1:20 C: 1:50 D: 1:100
本工程建施03一层平面图采用比例为( )。 A: 1:10 B: 1:20 C: 1:50 D: 1:100
AH和ESP的协议号分别是() A: 51;50 B: 50;51 C: 17;47 D: 47;17
AH和ESP的协议号分别是() A: 51;50 B: 50;51 C: 17;47 D: 47;17
中国大学MOOC: 采用全站仪对某一目标进行垂直角观测,盘左读数为91°12’47”,盘右读数为268°47’03”,则垂直角为( )。
中国大学MOOC: 采用全站仪对某一目标进行垂直角观测,盘左读数为91°12’47”,盘右读数为268°47’03”,则垂直角为( )。
对反应CO(g)+H2O(g)=H2(g)+CO2(g) A: KƟ =1 B: KƟ =Kc C: KƟ >Kc D: KƟ <Kc
对反应CO(g)+H2O(g)=H2(g)+CO2(g) A: KƟ =1 B: KƟ =Kc C: KƟ >Kc D: KƟ <Kc
TCP报文段首部的16进制为04 85 00 50 2E 7C 84 03 FE 34 D7 47 50 11 FF 6C DE 69 00 00,则这个TCP报文段目的端口值是( )。【本题填写十进制数结果】
TCP报文段首部的16进制为04 85 00 50 2E 7C 84 03 FE 34 D7 47 50 11 FF 6C DE 69 00 00,则这个TCP报文段目的端口值是( )。【本题填写十进制数结果】
假设 int a = 1; 表达式 a = 45 + 45*50%a--; 的结果是什么? A: 44 B: 45 C: 46 D: 47
假设 int a = 1; 表达式 a = 45 + 45*50%a--; 的结果是什么? A: 44 B: 45 C: 46 D: 47
【单选题】In the short transmission line model, the relative size of the sending end voltage Vs and the receiving end voltage Vr depends on the load power factor. Which of the following is correct? Power factor = 0.8 (leading) Power factor = 1 Power factor = 0.8 (lagging) A Vs > Vr Vs < Vr Vs < Vr B Vs < Vr Vs = Vr Vs < Vr C Vs < Vr Vs = Vr Vs > Vr D Vs > Vr Vs > Vr Vs > Vr A. See item A in the problem B. See item B in the problem C. See item C in the problem D. See item D in the problem
【单选题】In the short transmission line model, the relative size of the sending end voltage Vs and the receiving end voltage Vr depends on the load power factor. Which of the following is correct? Power factor = 0.8 (leading) Power factor = 1 Power factor = 0.8 (lagging) A Vs > Vr Vs < Vr Vs < Vr B Vs < Vr Vs = Vr Vs < Vr C Vs < Vr Vs = Vr Vs > Vr D Vs > Vr Vs > Vr Vs > Vr A. See item A in the problem B. See item B in the problem C. See item C in the problem D. See item D in the problem
(03:20-03:50)第三主题的旋律由哪些乐器演奏?
(03:20-03:50)第三主题的旋律由哪些乐器演奏?
6,7,18,23,( ),47 A: 25 B: 38 C: 40 D: 50
6,7,18,23,( ),47 A: 25 B: 38 C: 40 D: 50
地面大理石维修铺砂浆石过程中,找平层一般采用 1:3的干硬性水泥砂浆 A: 1:01 B: 1:02 C: 1:03 D: 2:03
地面大理石维修铺砂浆石过程中,找平层一般采用 1:3的干硬性水泥砂浆 A: 1:01 B: 1:02 C: 1:03 D: 2:03