A: The design and construction services are contracted by a single entity known as the design–builder or design–build contractor
B: The client commissions the consultants to produce conceptual or schematic design before leaves the project to the contractor.
C: The contractor needs to completes the design and produces the documentation required to construct the facility.
D: The contractor often completes the design before the construction.
举一反三
- Architectuew design can be divided ____ schematic design, preliminary design and construction drawing design.
- In a narrow sense, architecture design refers to schematic design, preliminary design and construction drawing design.
- From the view of design process, it can be divided into schematic design, preliminary design and construction drawing design.
- Which of the following are mine construction procedures ?( ) A: Mine pre-feasibility study B: Mine feasibility study C: Preliminary mine design D: Mine construction design
- 中国大学MOOC: 2. He was hired to _________ design and construction of the new facility.
内容
- 0
schematic design
- 1
These include design for reliability, design for serviceability, design for modularity and design for quality, which must be applied in the entire system.() A: for B: to C: with D: as
- 2
__________the view of design , the contents of interior architectural decoration design includes the interior style design , space design , lighting design , color design , environmental design , ornaments design etc.
- 3
Which style would Mr. Scott like to change the design for the inner packing of toy cars? A: the Disney-themed design B: the Christmas-themed design C: the time-travel themed design D: the Earth Day themed design
- 4
Which of the following is the correct order of phases in the systems development life cycle? A: analysis, planning, design, implementation B: analysis, design, planning, implementation C: planning, analysis, design, implementation D: design, analysis, planning, implementation