Contractor shall perform the ________ of all equipment, machinery or materials including the spare parts required for the construction of the plant.
举一反三
- Which one of the following would be an error of principle? A: Plant and machinery purchased was credited to a non-current assets account B: Plant and machinery purchased was debited to the purchases account C: Plant and machinery purchased was debited to the equipment account D: Plant and machinery purchased was credited to the equipment account
- The contractor shall observe and abide by all applicable laws, rules and regulations in connection with the Work.
- Business-to-business products include_________.( ) A: staple products B: equipment C: services and supplies D: parts and materials
- Most electrical equipment, including all fuse boxes, are installed in a safe manner.
- All deck machinery require routine maintenance work, including splash lubrication for all totally enclosed working parts, lubricating open gears and clutches with open gear compound and ____. A: oiling the bearings with lubricant from the forced feed system B: greasing bearings on the shafts with high pressure guns C: painting the exposed parts with anti-corrosion D: disassembling the moving parts once every two months