Which of the following is not a common type of rise coal haulage ( )?
A: Pipeline haulage
B: Belt conveyor haulage
C: Tramcar haulage
D: Autogenous haulage
A: Pipeline haulage
B: Belt conveyor haulage
C: Tramcar haulage
D: Autogenous haulage
举一反三
- For the permanent ramp haulage system, the side of slope with haulage ramp is permanent, and another side is a working slope.
- Which tunnels can be shared by multiple coal seams? ( ) A: Rise and dip B: District cross-cut C: District station D: Haulage way of section
- The development haulage system is divided into the permanent ramp and .
- The is usually laid in haulage way of zone to transport coal.
- According to the figure below, which of the following options does not match the serial number and name? ( )[img=583x316]1803a3a9559d2cf.png[/img] A: 1 - haulage roadway B: 2 - air inlet roadway C: 3 - belt conveyor D: 4 - switch, pump station and electrical equipment