• 2022-06-03
    (T/F) The cost of pipeline construction and maintenance is low.
    A: 正确
    B: 错误
  • B

    内容

    • 0

      The construction of the China-Myanmar oil and gas pipeline project lasted for almost 8 years._

    • 1

      When preparing a feasibility study for a new construction project, the first point is likely to be___________ A: the cost and availibility of the land B: the fees for the building design C: the construction cost D: the marketing cost

    • 2

      Interest rates on banker’s acceptances are low because the risk of default is very low.

    • 3

      f(t)*δ(t)=f(t) A: 正确 B: 错误

    • 4

      S. marketers are able to offer a fairly low price because A: they want to sell as much as possible in Japan B: direct marketing enables them to avoid the multitier distribution channels C: they prefer to keep the same price as it is in U. S. D: the cost of their products is low.