• 2022-06-14
    In designing the Verrazano Bridge, Othmar Ammann .
    A: had to account for the curvature of the earth's surface
    B: spent over a year building the platforms that form the bridge's base
    C: had to consider the number of vehicles that might cross the bridge at any one time
    D: wished to reduce the size of the bridge as much as possible
  • A

    内容

    • 0

      The bridge company sued the county for the full price of the bridge on the undisputed ground that the county had ________ the contract.

    • 1

      They ______________ (build) that bridge for over a year and it still isn’t finished. A: build B: built C: are building D: have been building

    • 2

      Which bridge below is not the wind and rain bridge? A: Xiaolong Bridge B: Puxiu Bridge C: Zhanlong Bridge D: Wenxing Bridge

    • 3

      What kind of bridge is the Golden Gate Bridge? A: beam bridge B: cable-strayed bridge C: suspension bridge D: arch stone bridge

    • 4

      ( )is not one of the Four Great Ancient Bridges in China? ( ) A: The Lugou Bridge in Beijing B: The Zhaozhou Bridge in Hebei C: The Luoyang Bridge in Fujian D: The Jade Belt Bridge in Beijing