The chief engineer in charge of the research project said it was too early as yet to _____________ any results.
举一反三
- 28. In the project, the person in charge of the project as the supervision unit is (). A: Project manager of supervision unit B: Chief supervision engineering C: Supervision Engineer D: General Manager of Supervision Unit
- When the chief engineer is in the machinery spaces, the officer in charge of the engineering watch shall_________
- The officer in charge of the engineering watch shall notify the chief engineer without delay
- 中国大学MOOC: At an unsheltered anchorage the chief engineer officer shall consult with_____ whether or not to maintain an underway watch. A. the engineer officer in charge of watch B. the deck officer in charge of watch C. the master D. the chief mate
- The<br/>officer in charge of the engineering watch shall notify the chief<br/>engineer without delay ____. A: in<br/>any emergency or if in any doubt as to what decision or measures to<br/>take B: in<br/>the event of any impending action in machinery spaces that may cause<br/>reduction in ship's speed C: when<br/>isolating and bypassing machinery to be worked on D: co-operating<br/>with any engineer in charge of maintenance work