Who’s Wang Hong ?
A: CEO of the Dongfang Power Station
B: Consultant Engineer with the Dongfang Power Station
C: Contractor Representative for Civil Works, CFSC Corporation
A: CEO of the Dongfang Power Station
B: Consultant Engineer with the Dongfang Power Station
C: Contractor Representative for Civil Works, CFSC Corporation
C
举一反三
- A water power station (build) ________ in the area several years ago.
- It is feared that people living near the power station may have been________to radiation.
- Once __________, this nuclear power station will supply all the neighboring towns and villages with clean and low-cost electricity.
- A water power station __in the area several years ago. A: build B: built C: is built D: was built
- _______ calling Hong Kong Ground, say again your call sign.( ) A: Aircraft B: Who C: Pilot D: Station
内容
- 0
有关JS22服务器的正确描述是:() A: Java Server R22 服务器 B: 基于POWER架构的刀片服务器 C: POWER Workstation 服务器 D: Java Station 服务器
- 1
Answer the questions below by choosing the right answer. 1. In the Skills Power Station, Jason, Yuan Shu and Yinan talked about _______.
- 2
What’s the woman’s address A: No.165, Dongfang Road. B: No.145, Shanghai Road. C: No.156, Fuxing Road.
- 3
If 300g of standard coal is used for 1kW.h of electric energy in a power station, the efficiency of generating electricity is (). A: 31% B: 41% C: 51% D: 61%
- 4
What’s the woman’s address A: No. 105, DongFang Road.’ B: No. 45, Taibei Road. C: No. 145, Shanghai Road.