中国大学MOOC: The consequence of a force majeure event on the contract are ( ).
Suspension or termination of the contract
举一反三
- The consequence of a force majeure event on the contract are ( ). A: Suspension or termination of the contract B: Renewal or cancellation of the contract C: Revision or suspension of the contract D: Reclassification or termination of the contract
- 中国大学MOOC: Which of the following events/accidents is a force majeure event? ( )
- 中国大学MOOC: When a force majeure event occurred, the affected party should ( ).
- The best way to stipulate force majeure events in the force majeure clause of a contract is to stipulate them in a synthesized way.。( )
- A contract must be terminated when there is a force majeure event.
内容
- 0
When a force majeure event occurs, it will ultimately lead to the termination of the contract.
- 1
智慧职教: Which of the following statements is not true about a force majeure event? ( )
- 2
智慧职教: Which of the following events is usually stipulated in the contract as force majeure?
- 3
中国大学MOOC: Which one of the following items is NOT an element of force majeure? ()
- 4
The time for performing the obligations ________ specifically prevented from performance by such event of force majeure shall be extended by a period equal to the period of delay caused by such event of force majeure.