What shall the record of the bid opening include that prepared by the Employer?
A: the bid price
B: the presence or absence of a bid security.
C: the name of the bidder
D: whether there is a withdrawa﹐l substitution﹐or modification
A: the bid price
B: the presence or absence of a bid security.
C: the name of the bidder
D: whether there is a withdrawa﹐l substitution﹐or modification
A,B,C,D
举一反三
- The Bidder shall bear all costs associated with the preparation and submission of its Bid, and the Employer shall be responsible or liable for those costs.
- The Bid price
- The correct statement about the bidding quotation is (). A: The bid price shall be lower than the market value of cost price, and lower than the social average cost price. B: The quotation can not be lower than the cost, but can be higher than the maximum bid price. C: If the quotation is lower than the cost, the bid evaluation committee shall reject the bid. D: The quotation can be lower than the cost, but not higher than the maximum bid price.
- 1. They have ________ a price which we think will be acceptable ________ you. A: bidden; to B: bid; to C: bidden; by D: bid; with
- Why does the opening bid need to be “the highest”?
内容
- 0
Which of the following is not a part of the bidding documents? A: Letter of Bid B: completed schedules as required, including priced Bill of Quantities C: Bid Security D: Private agreement
- 1
奥司他韦成人计量是()。 A: 30mg bid po B: 45mg bid po C: 60mg bid po D: 75mg bid po
- 2
When the buyer provides their own price, we call it “ bid the price ” .
- 3
The word “bid” is an offer to pay a particular price for something.
- 4
For banks, bid price is higher than ask price.