What shall the record of the bid opening include that prepared by the Employer?
A: the bid price
B: the presence or absence of a bid security.
C: the name of the bidder
D: whether there is a withdrawa﹐l substitution﹐or modification
A: the bid price
B: the presence or absence of a bid security.
C: the name of the bidder
D: whether there is a withdrawa﹐l substitution﹐or modification
举一反三
- The Bidder shall bear all costs associated with the preparation and submission of its Bid, and the Employer shall be responsible or liable for those costs.
- The Bid price
- The correct statement about the bidding quotation is (). A: The bid price shall be lower than the market value of cost price, and lower than the social average cost price. B: The quotation can not be lower than the cost, but can be higher than the maximum bid price. C: If the quotation is lower than the cost, the bid evaluation committee shall reject the bid. D: The quotation can be lower than the cost, but not higher than the maximum bid price.
- 1. They have ________ a price which we think will be acceptable ________ you. A: bidden; to B: bid; to C: bidden; by D: bid; with
- Why does the opening bid need to be “the highest”?