The Bidder shall bear all costs associated with the preparation and submission of its Bid, and the Employer shall be responsible or liable for those costs.
举一反三
- A firm that shuts down temporarily has to pay A: its variable costs but not its fixed costs. B: its fixed costs but not its variable costs. C: both its variable costs and its fixed costs. D: neither its variable costs nor its fixed costs.
- What shall the record of the bid opening include that prepared by the Employer? A: the bid price B: the presence or absence of a bid security. C: the name of the bidder D: whether there is a withdrawa﹐l substitution﹐or modification
- A cost-benefit analysis (CBA) should begin with () of all the costs and benefits associated with the project or decision.
- Private solutions may not be possible due to the costs of negotiating and enforcing these solutions. Such costs are called A: transaction costs. B: corrective costs. C: input costs. D: private costs.
- What does “gives me a sense of responsibility” in Paragraph 2 mean? It means ___. A: I shall be responsible for my parents B: I shall be responsible for my teacher C: I shall be responsible for the school D: I shall be responsible for myself