举一反三
- When the chief engineer is in the machinery spaces, the officer in charge of the engineering watch shall_________
- The officer in charge of the engineering watch shall notify the chief engineer without delay
- The chief engineer suggests that the second engineer () a dead line for handing in the work plan. A: will set B: shall set C: set D: set
- Each complete page of the oil Record Book must be signed by the ______. A: engineer on watch B: chief enginee C: chief mate D: maste
- The chief engineer in charge of the research project said it was too early as yet to _____________ any results.
内容
- 0
中国大学MOOC: At an unsheltered anchorage the chief engineer officer shall consult with_____ whether or not to maintain an underway watch. A. the engineer officer in charge of watch B. the deck officer in charge of watch C. the master D. the chief mate
- 1
按轮机部检修养护分工明细表规定,燃油速闭阀()负责管理;风油应急切断()负责管理;机舱堵漏设备()负责管理。 A: 二管轮/轮机长/大管轮 B: 大管轮/轮机长/二管轮 C: 大管轮/大管轮/二管论 D: 二管轮/大管轮/大管轮
- 2
With UMS, when the engine room is unwatched () will control the main engine. A: the bridge officer on watch B: the chief engineer C: the duty engineer D: the duty motorma
- 3
The general manager may employ ________ to take charge of the safety<br/>issues in the company. A: Quality Control staff B: Chief Engineer C: Chief Officer D: DPA
- 4
The officer in charge of the engineering watch shall continue to be responsible for machinery operations, ____the presence of the chief engineer in the machinery space.