A: 正确
B: 错误
举一反三
- Job Order Costing is used for production of large, unique, high-cost items.
- Normal spoilage adds to the cost of the job to which it is attributed in a job order costing system. A: 正确 B: 错误
- Normal spoilage adds to the cost of the job to which it is attributed in a job order costing system.
- A company would use a job order costing system when identical products are produced each period. A: 正确 B: 错误
- Which of the following is an absolute requirement in job costing? A: A client asks the company to quote for a job B: Use of a composite cost unit C: Job specific cost control procedures are put in place D: All direct costs of the job are coded to the job code
内容
- 0
The tickets each ______ 10 dollars. A: cost B: costs C: is costing D: are costing
- 1
Which of the following might motivate keeping a high level of inventory A: decreasing variability in demand B: high risk of product obsolescence C: item cost that does not change depending on order quantity D: a complex setup process when switching between production of two different products
- 2
The cost driver of an indirect cost is often used as the cost-allocation base. A: 正确 B: 错误
- 3
This book___ _me $ 10. A: will cost B: will be cost C: will be costing D: will be costed
- 4
High machining accuracy,( ), high automation, low labor intensity and high production efficiency are the machining characteristics of CNC machine tools. A: Machining parts with simple contour and mass production B: Strong adaptability to processing objects C: A single piece of parts which is difficult to fit or must rely on manual correction and positioning in order to machining accuracy. D: Suitable for machining billet with special large allowance and uneven material and allowance.