construction drawing
举一反三
- Construction lines are the only lines on a drawing which should be light.
- Architectuew design can be divided ____ schematic design, preliminary design and construction drawing design.
- In a narrow sense, architecture design refers to schematic design, preliminary design and construction drawing design.
- From the view of design process, it can be divided into schematic design, preliminary design and construction drawing design.
- (Single choice)(2 points)Regarding the budget preparation, what is done during the feasibility study phase is ( ) A: Construction drawing budget B: Project settlement C: Investment estimate D: Design estimates