(Single choice)(2 points)Regarding the budget preparation, what is done during the feasibility study phase is ( )
A: Construction drawing budget
B: Project settlement
C: Investment estimate
D: Design estimates
A: Construction drawing budget
B: Project settlement
C: Investment estimate
D: Design estimates
举一反三
- (Single Choice)The work of feasibility study stage of China's high-speed railway project does not include which of the following.( ) A: Project evaluation and decision B: Feasibility study C: Compilation of project proposal D: Design of construction drawing
- Which of the following are mine construction procedures ?( ) A: Mine pre-feasibility study B: Mine feasibility study C: Preliminary mine design D: Mine construction design
- When preparing a feasibility study for a new construction project, the first point is likely to be___________ A: the cost and availibility of the land B: the fees for the building design C: the construction cost D: the marketing cost
- The first phase of a project is the feasibility study. According to the PMBOK, which of the project management process group does the feasibility study phase need A: Plannin B: Planning and monitoring & controllin C: Initiating and closin D: All of five process groups: initiating, planning, executing, monitoring & controlling, and closin
- Which of the following is unlikely to be contained with a budget manual?( ) A: Administrative details of budget preparation B: Organisational structures C: Objectives of the budgetary process D: Selling overhead budget