A breach of the()undertaking of seaworthiness at the port of loading entitles the Charterer to refuse to load.
举一反三
- ]If a charter-party,although for two consecutive voyages,is held to be one indivisible contract,a deviation on the first voyage entitles the Charterer to treat the breach as a repudiation of()contract.
- Time chartering means that the shipowner provides a designated manned ship to the charterer, and the charterer employs the ship for a specific period against payment of hire. Under time chartering, the charterer is not liable for costs such as ( )A. bunker costs B. crew wagesC. port charges D. loading costs A: bunker costs B: crew wages C: port charges D: loading costs
- ()the Charterer seeks to say that the contract has been frustrated or that there has been an anticipatory breach which entitles him to rescind,then he has such rights as are given him at common law.
- The loading of the ship must be done in accordance with(). A: the ship’s instructions B: the terminal’s instructions C: the port captain’s instructions D: the charterer’s instructio
- If the Shipowner fails to give the Charterer the notice of readiness to load,and delay in commencing to load is thereby caused,the Charterer will (),as he is not bound to look out for the ship.