• 2021-04-14
    If the Shipowner fails to give the Charterer the notice of readiness to load,and delay in commencing to load is thereby caused,the Charterer will (),as he is not bound to look out for the ship.
  • B

    内容

    • 0

      Aboard a ship,multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in the load’s().

    • 1

      定期租船下,货物的装卸费由谁负责() A: shipowner B: charterer C: receiver D: holderofb/l

    • 2

      If the Charterer nominates an unsafe port and the ship is damaged through going there,() will be liable for the damage,subject to that the master acts reasonably in going there.

    • 3

      The loading of the ship must be done in accordance with(). A: the ship’s instructions B: the terminal’s instructions C: the port captain’s instructions D: the charterer’s instructio

    • 4

      中国大学MOOC: In case of voyage chartering, when lay days are saved because loading finishes earlier, the charterer pays dispatch money to the ship owner.