Which of the following items is not a method of economic evaluation?
A: cost minimization analysis
B: cost-benefit analysis
C: cost- effectiveness analysis
D: cost-utility analysis
E: cost analysis
A: cost minimization analysis
B: cost-benefit analysis
C: cost- effectiveness analysis
D: cost-utility analysis
E: cost analysis
举一反三
- Standard cost variance analysis表示标准成本分析
- Variance analysis include ( ) A: Schedule variance B: Cost variance C: The schedule performance index D: The cost performance index
- The evaluation index of variance analysis in EVM include ( )。 A: Schedule variance (SV) B: Cost performance index (CPI) C: Cost variance (CV) D: Project performance index (PPI)
- The document that officially sanctions the project is the ( )。 A: Project charter B: Feasibility study C: Project plan D: Benefit/Cost analysis
- Standard cost variance analysis表示标准成本分析 A: 正确 B: 错误