• 2022-06-06
    Task 1 Mr. Pacher is inspecting the concrete factory. Listen to the conversation and tick the items mentioned.New Wordforemen n. 工长
    A: Quality Assurance Program
    B: Prestressed concrete
    C: ISO9002 standards
    D: Work procedures for the concrete mix
    E: Auto batching plants
    F: Foremen
    G: Quality control
  • A,C,D,E,F,G

    内容

    • 0

      For fully prestressed concrete under the service load, in the section of concrete member A: Tensile stress is allowed to occur B: No tensile stress occurs C: Allow for cracks D: There is no compressive stress

    • 1

      In order to ensure the reliability of prestressed concrete axial tension members, in addition to the calculation of bearing capacity and crack control, the calculation of bearing capacity in construction stage and the local pressure of concrete at the end of post-tensioning members should also be carried out. A: 正确 B: 错误

    • 2

      ● Performing (74) involves monitoring specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory results. (74) A. quality planning B. quality assurance C. quality performance D. quality control

    • 3

      工厂方法模式的主要角色有:抽象工厂(Abstract Factory) 、 具体工厂(Concrete Factory) 、抽象产品(Product)和具体产品(Concrete Product)。

    • 4

      Task 1Mr. Dawson is talking with an engineer Ms. Zhang. Listen to the conversation and tick the items mentioned. A: Electrical systems B: Mechanical systems C: Power supply systems D: Switchgears E: Transformers F: Removal from storage G: Installation