Task 1 Mr. Pacher is inspecting the concrete factory. Listen to the conversation and tick the items mentioned.New Wordforemen n. 工长
A: Quality Assurance Program
B: Prestressed concrete
C: ISO9002 standards
D: Work procedures for the concrete mix
E: Auto batching plants
F: Foremen
G: Quality control
A: Quality Assurance Program
B: Prestressed concrete
C: ISO9002 standards
D: Work procedures for the concrete mix
E: Auto batching plants
F: Foremen
G: Quality control
举一反三
- Task 5.1Mr. Wright is inspecting the site. Listen to the conversation and tick the items mentioned.New Wordinitial audit 初次审计 A: Concrete specifications B: Reinforcement work C: Initial audit D: Reinforcement bars E: Quality certificates
- Task 5.2Mr. Wright is inspecting the site. Listen to the conversation and tick the items mentioned.New Wordinitial audit 初次审计 A: Test reports B: Physical characteristics C: Mechanical characteristics D: Chemical components
- The specific meaning of the terms "reinforced concrete and prestressed concrete" are ______ .
- Which of the following is the mostly used type of concrete pavement? A: Jointed plain concrete pavement (JPCP) B: Jointed reinforced concrete pavement (JRCP) C: Continuously reinforced concrete pavement (CRCP) D: Prestressed Concrete Pavements (PCP)
- In order to ensure the reliability of prestressed concrete axial tension members, in addition to the calculation of bearing capacity and crack control, the calculation of bearing capacity in construction stage and the local pressure of concrete at the end of post-tensioning members should also be carried out.