• 2022-06-04
    ‌Which of the following should be treated as a separate phase of software life cycle? ______​‌下列哪一个应该被视为软件生命周期的单独阶段? ______​
    A: Testing
    B: Project Planning
    C: Implementation and integration
    D: Documenting
  • C

    内容

    • 0

      The life cycle of a project is a description of the various phases of the project from the beginning to the end. One of the followings is not a phase of the traditional project life cycle, It is(). A: development B: concept C: system analysis D: implementation

    • 1

      Which of the following should ...为软件生命周期的单独阶段? ______

    • 2

      Project Initiation is the first phase in the project management life cycle .

    • 3

      In the software testing phase of SDLC, which of the following attributes and capacities of the software could be tested? A: Functionality B: Reliability C: Efficiency D: All above

    • 4

      In<br/>Software Development Life Cycle, ____ is a preliminary study before<br/>the main work of a project starts, which finds out the probability of<br/>the project’s success. A: feasibility<br/>study B: requirement<br/>analysis C: implementation D: operation<br/>and maintenance