which one is not the dimension of a plan?
A: repetitiveness
B: scope
C: time
D: scheduling
A: repetitiveness
B: scope
C: time
D: scheduling
举一反三
- The decision as to which available process will be executed by the processor: A: long-term scheduling B: I/O scheduling C: medium-term scheduling D: short-term scheduling
- ___ waste water was put into the rivers, and lakes which were badly polluted. A: At one time B: At a time C: One time D: A time
- A system administrator needs to upgrade the Oracle database from Version 7 to Version 8. Which of the following scheduling concerns should be considered?() A: Schedule enough down time to backup, upgrade and reboot. B: Backup, upgrade, then schedule enough down time to reboot the system. C: Backup, then schedule enough down time to upgrade and reboot the system. D: There are no scheduling concerns because no down time is required.
- The project scope is measured against the ______, while the product scope is measured against the ______. A: plan, requirements B: requirements, measure of success C: scope baseline, scope definition D: contract, verification
- Any investigation which covers a long _______ of time is bound to encounter certain special problems. A: rank B: span C: scope D: scale