    What are the technical factors to be considered in mining methods? ( )
    A: Equipment level
    B: Technology method
    C: Strata control
    D: Cost per ton of coal
  • A,B,C

    内容

    • 0

      An analysis of past maintenance costs indicates that maintenance cost is an average of $0.40 per machine-hour at an activity level of 20,000 machine-hours and $0.50 per machine-hour at an activity level of 16,000 machine-hours. Assuming that this activity is within the relevant range, what is the total expected maintenance cost if the activity level is 18,500 machine-hours? A: $1,600 B: $6,960 C: $8,000 D: $9,000

    • 1

      What are the benefits of tilting the layered steps? ( ) A: Easy to separate mining of ore and rock and improve ore quality B: Convenient for transportation equipment operation C: Convenient for mining equipment operation D: Ease of layering

    • 2

      Which of the following methods is not the research based on market method? A: Questionnaire B: Data mining C: User interview D: User observation

    • 3

      Which of the following is not a major problem to be solved in mine field development method?( ) A: Mining methods B: Shaft (adit) form C: Number of mining levels D: Layout of main haulage roadway

    • 4

      What is the purpose of considering such factors as cost and quality during tender evaluation? A: To find the most economical advantageous tender. B: To ask the suppliers to lower cost and improve quality. C: To learn about the financial stability and service level of the suppliers.