The project must be ________ in accordance with the latest estimate of the cost.
A: modified
B: discarded
C: submitted
D: yielded
A: modified
B: discarded
C: submitted
D: yielded
举一反三
- Inputs to determine budget include all of the following EXCEPT (). A: cost baseline B: cost estimate C: work breakdown structure D: project schedule
- Inputs to determine budget include all of the following EXCEPT ______ . A: A) cost baseline B: B) cost estimate C: C) work breakdown structure D: D) project schedule
- In short run the shutdown point is that point at which A: price equals marginal cost. B: average fixed cost equals marginal cost. C: average variable cost equals marginal cost. D: average total cost equals marginal cost.
- We were only able to make a ______ estimate of annual cost.
- estimate:We estimate the cost to be five thousand dollars. A: 估计 B: 考虑 C: 预算 D: 花费