• 2022-06-06 问题

    All deck machinery require routine maintenance work, including splash lubrication for all totally enclosed working parts, lubricating open gears and clutches with open gear compound and ____. A: oiling the bearings with lubricant from the forced feed system B: greasing bearings on the shafts with high pressure guns C: painting the exposed parts with anti-corrosion D: disassembling the moving parts once every two months

    All deck machinery require routine maintenance work, including splash lubrication for all totally enclosed working parts, lubricating open gears and clutches with open gear compound and ____. A: oiling the bearings with lubricant from the forced feed system B: greasing bearings on the shafts with high pressure guns C: painting the exposed parts with anti-corrosion D: disassembling the moving parts once every two months

  • 1