The overall length of gas pipeline was planned to reach 300.000 km — enough to ____ to the moon and back.
A: hover
B: stretch
C: limp
D: expose
A: hover
B: stretch
C: limp
D: expose
举一反三
- The overall length of gas pipeline was planned to reach 300,000 km---enough to __________ to the moon and back. A: hover B: stretch C: limp D: expose
- The overall length of gas pipeline was planned to reach 300,000 km---enough to ____ to the moon and back. A: expose B: stretch
- The China-Myanmar oil and gas pipeline project include ______.
- If you placed all the cans used in the United States in one year end to end, they would reach to the moon and back twelve times.
- The China-Myanmar oil and gas pipeline project benefited Myanmar in ______.