4. If a marine engineering project may have limited adverse environmental impact, it is required to prepare an environmental impact .
A: statement
B: report form
C: registration form
D: none of the above
A: statement
B: report form
C: registration form
D: none of the above
举一反三
- 2. are mandatory environmental standards. (3 points) A: Technical guidelines for environmental impact assessment of marine engineering B: The specification for marine monitoring C: Discharge standard for water pollutants from ships D: Specifications for oceanographic survey
- Environmental specialists study the project’s impact ▁ the local area
- The systematic process of identifying future consequences of a<br/>current or proposed action called as __________() A: Environmental<br/>Protection B: Environmental Evaluation C: Environmental Impact Assessment D: None of them
- Cradle-to-grave assessment is the assessment of the environmental impact of a product or service
- The passage is mainly about ______. A: the composition of environment B: the impact of environment on human C: the impact of human on environment D: the causes of environmental problems