All of the following are examples of tools often used in estimate costs EXCEPT ().
A: parametric modeling
B: analogous estimating
C: bottom-up estimating
D: activity duration estimates
A: parametric modeling
B: analogous estimating
C: bottom-up estimating
D: activity duration estimates
举一反三
- The value of the painting was________ at several thousand dollars. A: estimate B: estimating C: estimated D: estimates
- When estimating population parameters, a point estimate is:? always equal to a population value.|a range of possible values for a population parameter.|the population mean.|a statistic that estimates a population parameter.
- The project charter for a project was approved for planning and you have Just been assigned as project manager.Realizing that project planning is an ongoing effort throughout the project,which processes are you MOST likely to combine ?() A: Create WBS and activity definitio B: Activity duration estimating and schedule developmen C: Human resource planning and cost estimatin D: Cost estimating and cost budgetin
- Which of the following is false? ( ) A: Contingency is not a substitute for proper cost estimating B: Contingency should be included in Base Estimates in budgets, cost plans or forecasts C: An undesirable event that is highly likely to occur should be included in the Base Estimate, not in contingency D: The calculation of contingency should align with the project risk profile
- 10 It was difficult to __ how many people had been wounded in the earthquake. A: estimate B: estimated C: estimating D: estimation