Among the areas getting a _________, is the Trans-Asian railway system.
举一反三
- The Southeast Asian section of the Trans-Asian Railway starts from China's Southwest city of Kunming, it ______________ Vietnam, Cambodia, eventually ending in Singapore.
- Closed-loop control system is an automatic control system. Open-loop control system is not an automatic control system.
- Which of the following is not the basic system of language?? The grammar system.|The word system.|The sound system.|Alphabet system.
- A computer system consists of hardware system and software system.
- The traditional Chinese system is a combination of the solar system and the lunar system.