What is slope of passive portfolio return and risk line if you draw risk on x-axis and return on y-axis?
______
______
举一反三
- Suppose that the risk-free rate is 5%, risky asset weight (the y) is 50% and market risk premium on risky asset is 5%, what is the expected portfolio return of our portfolio? Write in percentages with the % symbol.______
- _______ indicates that the zero,Y,Z return is over for the respective axis X.
- 中国大学MOOC: If a country produces good Y (measured on the vertical axis) and good X (measured on the horizontal axis), then the absolute value of the slope of its production possibility frontier is equal to _____________.
- 中国大学MOOC: On a line chart, the x-axis is also called the dependent axis because its values depend on those of the y-axis.
- The difference between risk averse and risk neutral investors is that risk neutral investors only consider expected rate of return while risk averse investors needs compensation for risk