• 2022-05-31
    Trip-related cost includes loading/unloading costs and a portion of the fuel cost that varies with the quantity being transported.
  • 错误

    内容

    • 0

      Time charter generally does not include loading and unloading costs in the charter rate.

    • 1

      I really want the match, however much ______. A: does it cost B: costs it C: will it cost D: it costs

    • 2

      2. Direct costs are A: Costs which can be identified with a cost center but not identified to a single cost unit B: Costs which can be economically identified with a single cost unit C: Costs which can be identified with a single cost unit, but it is not economic to do so D: Costs incurred as a direct result of a particular decision.

    • 3

      Chartering a ship with "Time Charter " type is similar to chartering a car for one or more days when we have a travel. In this process, which of the following costs should be taken by the ship charterer? A: crew wages B: ship repair cost C: fuel cost D: shipbuilding cost

    • 4

      Chartering a ship with "Voyage Charter" type is similar to taking a taxi. In this process, which of the following costs should be taken by the ship charterer? A: Shipbuilding cost B: Crew wages C: Fuel cost D: None of the other items