Which of the following items belongs to the engineering project? ( )
A: A manned spacecraft launch
B: " Five one "project
C: Develop a piece of software
D: Construction of the Beijing-Shanghai express railway
A: A manned spacecraft launch
B: " Five one "project
C: Develop a piece of software
D: Construction of the Beijing-Shanghai express railway
举一反三
- Which of the following items belongs to the engineering project ? ( ) A: A manned spacecraft launch B: The teaching building C: Develop a piece of software D: Five one project
- (Single Choice)In the project management of railway construction, which of the following is the mode of contracting according to the quantity of project.( ) A: The lump-sum contracting mode B: The construction management mode C: The general project contracting mode D: The unit price contracting mode
- Which of the following software lifecycle models is the best one for a software development organization and a project? A: Waterfall model B: Rapid prototype model C: Incremental model D: It depends.
- (Single Choice)The work of feasibility study stage of China's high-speed railway project does not include which of the following.( ) A: Project evaluation and decision B: Feasibility study C: Compilation of project proposal D: Design of construction drawing
- According to the construction law and relevant regulations, the construction unit should apply for the construction license of the project is ( ). A: Project approved by the State Council B: Low rise houses built by farmers with a construction area of more than 200 square meters C: Urban municipal infrastructure engineering D: Project with an investment of more than 200,000 yuan