(Single Choice)The work of feasibility study stage of China's high-speed railway project does not include which of the following.( )
A: Project evaluation and decision
B: Feasibility study
C: Compilation of project proposal
D: Design of construction drawing
A: Project evaluation and decision
B: Feasibility study
C: Compilation of project proposal
D: Design of construction drawing
举一反三
- (Single choice)(2 points)Regarding the budget preparation, what is done during the feasibility study phase is ( ) A: Construction drawing budget B: Project settlement C: Investment estimate D: Design estimates
- The document that officially sanctions the project is the ( )。 A: Project charter B: Feasibility study C: Project plan D: Benefit/Cost analysis
- Which of the following are mine construction procedures ?( ) A: Mine pre-feasibility study B: Mine feasibility study C: Preliminary mine design D: Mine construction design
- When preparing a feasibility study for a new construction project, the first point is likely to be___________ A: the cost and availibility of the land B: the fees for the building design C: the construction cost D: the marketing cost
- In<br/>Software Development Life Cycle, ____ is a preliminary study before<br/>the main work of a project starts, which finds out the probability of<br/>the project’s success. A: feasibility<br/>study B: requirement<br/>analysis C: implementation D: operation<br/>and maintenance