• 2022-06-09
    A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need todetermine the current hardware configuration of the partitions before making any upgrade decisions. What isneeded to read the exported system plan and design the new system?()
    A: e-Config
    B: System Planning Tool (SPT)
    C: IBM Workload Estimator (WLE)
    D: IBM Performance Monitor (PM)
  • B

    举一反三

    内容

    • 0

      Your customer requires you to supply a configuration or proposal in xl format.  What tool is available? () A: IBM Standalone Solutions Configuration Tool (SSCT ) B: Server Proven C: Configuration Options Guide (COG) D: xREF (System X reference)

    • 1

      After an upgrade, the computer system become _________ .

    • 2

      What IBM resource helps to easily identify a business application that has been validated on IBM Systems?() NOTE: Solutions that are in this resource represent applications that enable IBM Systems and verify, through customer experience, installing and running in a customer location. A: IBM Standalone Solutions Configuration Tool (SSCT) B: IBM Server Proven C: IBM System x Reference Sheets (xREF) D: IBM Sizing Guides

    • 3

      A computer system consists of hardware system and software system.

    • 4

      _____is not included in the system to be prepared when the main engine is preparing for the vehicle. A: Power system B: Lubricating oil system C: Compressed air system D: Air conditioning system