When preparing a feasibility study for a new construction project, the first point is likely to be___________
A: the cost and availibility of the land
B: the fees for the building design
C: the construction cost
D: the marketing cost
A: the cost and availibility of the land
B: the fees for the building design
C: the construction cost
D: the marketing cost
举一反三
- The document that officially sanctions the project is the ( )。 A: Project charter B: Feasibility study C: Project plan D: Benefit/Cost analysis
- Which of the following are mine construction procedures ?( ) A: Mine pre-feasibility study B: Mine feasibility study C: Preliminary mine design D: Mine construction design
- (Single Choice)The work of feasibility study stage of China's high-speed railway project does not include which of the following.( ) A: Project evaluation and decision B: Feasibility study C: Compilation of project proposal D: Design of construction drawing
- In a small construction firm, another crew supervisor is added for every 10 workers employed. This is an example of a: A: a. purely variable cost B: b. discretionary fixed cost C: c. step cost D: d. mixed cost
- (T/F) The cost of pipeline construction and maintenance is low. A: 正确 B: 错误