A cost-benefit analysis (CBA) should begin with () of all the costs and benefits associated with the project or decision.
举一反三
- The document that officially sanctions the project is the ( )。 A: Project charter B: Feasibility study C: Project plan D: Benefit/Cost analysis
- A cost-benefit analysis is the process used to measure ( ) or ( ) associated with taking that action.
- Which of the following items is not a method of economic evaluation? A: cost minimization analysis B: cost-benefit analysis C: cost- effectiveness analysis D: cost-utility analysis E: cost analysis
- 2. Direct costs are A: Costs which can be identified with a cost center but not identified to a single cost unit B: Costs which can be economically identified with a single cost unit C: Costs which can be identified with a single cost unit, but it is not economic to do so D: Costs incurred as a direct result of a particular decision.
- According to the cost-benefit analysis, the potential donors are likely to become active donors if they can get more benefits and less costs. </p></p>