- Train Company has two service departments, Maintenance and Human Resources. Train Company also has two production departments, Mixing and Finishing. Maintenance costs are allocated based on square footage while Human Resources costs are allocated based on number of employees. The following information has been gathered for the current year: Maintenance Human Resources Mixing Finishing Direct costs $50,400 $33,600 $42,000 $70,000 Square footage 1,600 800 3,200 2,400 Number of employees 16 24 48 64 If the direct method is used to allocate service department costs, then the total cost of the Human Resources Department after the Maintenance Department cost allocation would be ________.
- Maintenance means to control the timing of equipment maintenance.That is to say, the timing of maintenance is achieved through the use of different maintenance methods.Currently, there are three maintenance methods, which are: A: Periodic maintenance B: On-condition maintenance C: Random maintenance D: Breakdown Maintenance
- With ________ based CNC machine tool controllers, maintenance and repair are no longer an issue.
- Which of the following maintenance is to improve the performance of the software product? A: perfective maintenance B: adaptive maintenance C: corrective maintenance D: none of the above
- The total cost of owning technology resources includes costs for hardware and software upgrades, maintenance, technical support, and training.
内容
- 0
What are the typical features of WPCs? A: weather resistant B: environmentally sustainable C: long-lasting D: higher maintenance costs
- 1
The four types of costs that are found in the Life Cycle Costing concept are ______. A: operating/maintenance, discard, direct, and variable B: indirect, auxiliary, development, and production C: operating/maintenance, development, discard, and production D: indirect, auxiliary, indirect, and direct
- 2
The following potential cash flows are predicted for maintenance costs for the Great machine: Year Cash flow Probability ($) 2 19,000 0.55 2 26,000 0.45 3 21,000 0.3 3 25,000 0.25 3 31,000 0.45What is the expected present value of the maintenance costs for year 2 (to the nearest whole number)?$
- 3
An analysis of past maintenance costs indicates that maintenance cost is an average of $0.40 per machine-hour at an activity level of 20,000 machine-hours and $0.50 per machine-hour at an activity level of 16,000 machine-hours. Assuming that this activity is within the relevant range, what is the total expected maintenance cost if the activity level is 18,500 machine-hours? A: $1,600 B: $6,960 C: $8,000 D: $9,000
- 4
All maintenance workers must be skilled in a variety ______maintenance tasks, A: of B: from