• 2022-06-06
    The following is true of the traditional approach to grid operational risk assessment ( ) .
    A: Qualitative analysis
    B: Probability analysis
    C: Status Assessment
    D: Qualitative analysis, probability analysis , status Assessment
  • D

    内容

    • 0

      Big Data Technology can be applied to optimize the operation of<br/>power grid, analysis of operational risks and abnormal power<br/>consumption, including () . A: Assessment of grid operation time for WAMS B: Intelligent alarm for electric power dispatching control C: Distribution Network Risk Assessment D: Detection<br/>of non-technical line losses E: Refined management of technical line loss

    • 1

      Which of the following is a limitation of analysis of financial statements? ( ) A: Based on accounting concepts B: Affected by personal bias C: To know the financial strength D: Lack of Qualitative Analysis

    • 2

      “容量法”的英文词汇是_________。 A: volumetric method B: gravimetric method C: quantitative analysis D: qualitative analysis

    • 3

      Which of the following usually does not be included in a A LCI (life-cycle inventory) study A: Goal and scope definition B: Inventory analysis C: Impact assessment D: Interpretation

    • 4

      An assessment that defines jobs and the behaviors necessary to perform them is known as a ________. A: job description B: job specification C: job preview D: job analysis