the traditional approach to grid operational risk assessment,the following is true ( ) 。
A: Qualitative Analysis
B: Qualitative Analysis, probabilistic analysis, status Assessment
C: Status Assessment
D: probabilistic analysis
A: Qualitative Analysis
B: Qualitative Analysis, probabilistic analysis, status Assessment
C: Status Assessment
D: probabilistic analysis
举一反三
- The following is true of the traditional approach to grid operational risk assessment ( ) . A: Qualitative analysis B: Probability analysis C: Status Assessment D: Qualitative analysis, probability analysis , status Assessment
- The following is true of the traditional approach to grid operational risk assessment () . A: Qualitative analysis B: Probability analysis C: Status Assessment D: All of the above
- Which one of the following is notincluded in a needs assessment? A: Organizational analysis B: Person analysis C: Competitive analysis D: Task analysis
- “重量法”的英文词汇是_________。 A: gravimetric analysis B: volumetric analysis C: qualitative analysis D: quantitative analysis
- Big Data Technology can be applied to optimize the operation of power grid, analysis of operational risks and abnormal power consumption, including ( ) 。 A: Refined management of technical line loss B: Intelligent alarm for electric power dispatching control C: Distribution Network Risk Assessment D: Detection of non-technical line losses E: Assessment of grid operation time for WAMS